Nesite installed the complete raised floor of the new Thélios Hq, supplying a solution made of panels with ceramic upper covering, in 60 x 60 and 60 x 120 cm formats.
The peculiarity of the project lies in the installation, in certain areas, of a customized solution created with precise aesthetic characteristics according to the design drawing.
MATERIAL SUPPLIED
1.200 m2 of raised floorcomposed of panels 60 x 60 cm with high-density calcium sulphate core, 30 mm thick, and ceramic upper covering;
200 m2 of raised floorcomposed of panels 120 x 60 cm with high-density calcium sulphate core, 30 mm thick, and ceramic upper covering;
60 m2 of customized raised floor upon design drawing, made using various combination of ceramic strips of different sizes and colors;
The ceramic/porcelain stoneware raised floor offers a wide range of colors and sizes, with solutions which can satisfy the contemporary taste for modern spaces but also recreate the warmth of most classic environments similar to natural materials (wood and marble).
PIRELLI 35, owned by COIMA Sgr, is among the largest urban regeneration projects designed by Park Associati and Snøhetta. The building will be fully integrated by Nesite's raised floor solutions, with systems designed to complement the work from the high standards of sustainability, automation and connectivity. THE PROJECT Pirelli 35, one of the symbols of
SeiMilano is the city-garden by Mario Cucinella Architects designed to create an interconnected and sustainable urban ecosystem. The project, which involves the redevelopment of more than 300,000 sqm, will employ Nesite raised flooring throughout the entire commercial area of 30,000 sqm. THE PROJECT. SeiMilano is the result of the partnership between Borio Mangiarotti and Värde Partners
To conserve, to appropriate the pre-existing while respecting its historical authenticity, to hand down to posterity aware of the importance of leaving evidence. These are the premises that guided the realization of the new Adriatic LNG work hub, an intervention perfectly integrated in the original architecture, where the installation of raised floor has mainly filled the gaps in terms of plant engineering and space.organization.