The Intermodal Pole, after 29 years of waiting, has become a reality: Trieste is now the first airport connected to the railway line in the Northeast region.
The projects has included the realisation of:
a new train stop;
a new bus station;
2800 square meters of pedestrian area and an air-conditioned waiting room;
multi-storey car park with a capacity of 500 cars;
1000 street level parkings;
a 425-meter pedestrian catwalk
Precisely in this catwalk, symbol of the new airport, Nesite installed the entire floating floor, supplying a specific solution for outdoor environments.
MATERIAL SUPPLIED
» 2.000 sqm of raised floor for outdoor Twin Floor;
TWIN FLOOR panel in the outdoor
version is characterized by the
coupling of the gres or stone top
finish by a specific adhesive with
a reinforcing layer made of
a fibre-reinforced structural core.
Nesite raised floors in the urban regeneration of MIND with Horizon 4.1, an architectural structure that is part of the Westgate complex's "To Work" system, which combines functional flexibility and conscious materiality with a deep connection to the urban and natural context. THE PROJECT Owned by Arexpo/Lendlease and designed by PIUARCH, in collaboration with Waugh
SeiMilano is the city-garden by Mario Cucinella Architects designed to create an interconnected and sustainable urban ecosystem. The project, which involves the redevelopment of more than 300,000 sqm, will employ Nesite raised flooring throughout the entire commercial area of 30,000 sqm. THE PROJECT. SeiMilano is the result of the partnership between Borio Mangiarotti and Värde Partners