The Intermodal Pole, after 29 years of waiting, has become a reality: Trieste is now the first airport connected to the railway line in the Northeast region.
The projects has included the realisation of:
a new train stop;
a new bus station;
2800 square meters of pedestrian area and an air-conditioned waiting room;
multi-storey car park with a capacity of 500 cars;
1000 street level parkings;
a 425-meter pedestrian catwalk
Precisely in this catwalk, symbol of the new airport, Nesite installed the entire floating floor, supplying a specific solution for outdoor environments.
MATERIAL SUPPLIED
» 2.000 sqm of raised floor for outdoor Twin Floor;
TWIN FLOOR panel in the outdoor
version is characterized by the
coupling of the gres or stone top
finish by a specific adhesive with
a reinforcing layer made of
a fibre-reinforced structural core.
Nesite in "gioia 22" Project More than 25,000 square meters of raised floor for the new tower with a strongly green footprint, in Milan's Porta Nuova - Gioia district. The Project Part of the urban redevelopment plan for the creation of Milan’s new Porta Nuova – Gioia district, “Gioia22” stands in the former area of
New look for EF Solare of Trento, the first photovoltaic operator in Italy. The headquarters has been completely renovated in the interior, a new interpretation of aesthetics and space by arch. Danilo Vespier – studio Vespier Architects.
From a simple "option" to an ethical and conscious choice, today sustainability really counts and Athesys, with the restructuring of its headquarters, wanted to give a real demonstration of this.