The Intermodal Pole, after 29 years of waiting, has become a reality: Trieste is now the first airport connected to the railway line in the Northeast region.
The projects has included the realisation of:
a new train stop;
a new bus station;
2800 square meters of pedestrian area and an air-conditioned waiting room;
multi-storey car park with a capacity of 500 cars;
1000 street level parkings;
a 425-meter pedestrian catwalk
Precisely in this catwalk, symbol of the new airport, Nesite installed the entire floating floor, supplying a specific solution for outdoor environments.
MATERIAL SUPPLIED
» 2.000 sqm of raised floor for outdoor Twin Floor;
TWIN FLOOR panel in the outdoor
version is characterized by the
coupling of the gres or stone top
finish by a specific adhesive with
a reinforcing layer made of
a fibre-reinforced structural core.
To conserve, to appropriate the pre-existing while respecting its historical authenticity, to hand down to posterity aware of the importance of leaving evidence. These are the premises that guided the realization of the new Adriatic LNG work hub, an intervention perfectly integrated in the original architecture, where the installation of raised floor has mainly filled the gaps in terms of plant engineering and space.organization.
Nesite raised floors in the Sunglass Industry office area, a solution with finishing in concrete-look ceramic of beige colour, for a perfect integration with the soft colors of the furnishings. The 60 x 120 cm format of the tiles, instead, emphasizes the chromatic contrasts and the graphic effects on the surface.