founded in 2001, cma lift is one of the most dynamic companies in the production of elevators and components.
As company strongly oriented towards the foreign market, CMA elevators push on the internalization renewing its brand, now CMA Lifts, and opening a new and prestigious venue which reflects the identity of a company known, worldwide, for their own excellence.
Nesite is proud to have been chosen for the raised floor of this prestigious headquarter, whose installation, together with the installation of all the partition walls of the spaces, has been assigned to the same Nesite Contract.
About 1000 sqm of Nesite raised floor with calcium sulphate 30 mm and polished ceramic (PG6AMH), glass partitions 5 + 5 mm extra-clear transparent on layers of acoustic PVB, as well as coated walls in customized melamine.
We will come back soon with more details about this project and all activities realized for CMA Lifts by Nesite Contract.
Twin Floor system is made by a non-slip gres ceramic top covering and a bottom tile core with reinforcement function, composed of inert and inorganic materials, with very high density.
From a typography to a residential design loft: this is the transformation that Nesite Contract has been able to carry out by intervening in the open space of a post-industrial building in Padua.
The particularity of the project lies in the installation, in certain areas, of a customised product based on precise aesthetic characteristics foreseen by the project design.
Wilberg Atrium is the multifunctional building signed Griff Arkitektur, designed to achieve the maximum energy efficiency.
It was completely equipped with a UFAD (Underfloor Air Distribution) system integrated by the Nesite raised floor able to distribute the air flows in the heating and cooling operations.