founded in 2001, cma lift is one of the most dynamic companies in the production of elevators and components.
As company strongly oriented towards the foreign market, CMA elevators push on the internalization renewing its brand, now CMA Lifts, and opening a new and prestigious venue which reflects the identity of a company known, worldwide, for their own excellence.
Nesite is proud to have been chosen for the raised floor of this prestigious headquarter, whose installation, together with the installation of all the partition walls of the spaces, has been assigned to the same Nesite Contract.
About 1000 sqm of Nesite raised floor with calcium sulphate 30 mm and polished ceramic (PG6AMH), glass partitions 5 + 5 mm extra-clear transparent on layers of acoustic PVB, as well as coated walls in customized melamine.
We will come back soon with more details about this project and all activities realized for CMA Lifts by Nesite Contract.
Twin Floor system is made by a non-slip gres ceramic top covering and a bottom tile core with reinforcement function, composed of inert and inorganic materials, with very high density.
From a typography to a residential design loft: this is the transformation that Nesite Contract has been able to carry out by intervening in the open space of a post-industrial building in Padua.
Bassi Business Park, one of the largest urban redevelopment projects underway in Milan, is the new complex of buildings with high energy and environmental performance, which will lead to the recovery of more than 70,000 square metres of built area. The project includes the use of Nesite raised floors, a functional and ethical choice related
Designed by architect Jean Nouvel, winner of the Pritzker Prize, the Louvre in Abu Dhabi is one of the most ambitious cultural projects in the world, comprising 55 individual buildings inspired by the medina and Arab settlements.