The CLOUD is a work of extraordinary artistic value, characterized by innovative logistical solutions and by the choice of technologically advanced materials.
The structure is an independent cocoon-like structure that is covered in 15.000 sqm of highly advanced membrane fiber glass and flame-retardant silicone.
Inside the ‘Cloud’, five levels (supported by escalators and walkways) lead to a 1.800 capacity auditorium.
MATERIAL SUPPLIED
01. TETRIS Floor System 1200 x 600 and 600 x 600 mm, 38 mm thick, supplied with a special gasket 10 mm – compressed up to 5 mm – designed to hold any expansion in order to ensure the stability of the floor and the surface finish in resin.
Tetris Floor is a tongue and groove hollow floor system, made of calcium sulphate, the only building material of its kind that is classified throughout Europe with building materials class A1.
Per la nuova e prestigiosa sede di CMA LIFTS Nesite Contract ha curato la posa e l’installazione del pavimento e di tutte le pareti divisorie degli spazi.
Designed by Arquitectos Ayala, the new headquarters of the Banco Popular in Madrid was conceived following the “well” protocol. With a building orientation along the north – south axis, a pleasant, functional and efficient work space has been created, characterized by natural light and wide open spaces. The Banco Popular HQ is a LEED Gold building where the Nesite
In the heart of Milan, between San Siro and City Life, rises Ivory, an urban regeneration project that transforms a 1950s industrial building into a modern office complex. Designed by the Piuarch studio and financed by COIMA, the project is an outstanding example of sustainable architecture and innovative design, featuring flexible and high-performance workspaces. THE