The CLOUD is a work of extraordinary artistic value, characterized by innovative logistical solutions and by the choice of technologically advanced materials.
The structure is an independent cocoon-like structure that is covered in 15.000 sqm of highly advanced membrane fiber glass and flame-retardant silicone.
Inside the ‘Cloud’, five levels (supported by escalators and walkways) lead to a 1.800 capacity auditorium.
MATERIAL SUPPLIED
01. TETRIS Floor System 1200 x 600 and 600 x 600 mm, 38 mm thick, supplied with a special gasket 10 mm – compressed up to 5 mm – designed to hold any expansion in order to ensure the stability of the floor and the surface finish in resin.
Tetris Floor is a tongue and groove hollow floor system, made of calcium sulphate, the only building material of its kind that is classified throughout Europe with building materials class A1.
PIRELLI 35, owned by COIMA Sgr, is among the largest urban regeneration projects designed by Park Associati and Snøhetta. The building will be fully integrated by Nesite's raised floor solutions, with systems designed to complement the work from the high standards of sustainability, automation and connectivity. THE PROJECT Pirelli 35, one of the symbols of
Nesite has been involved in the renovation works of the Extra MAXXI hall. 4.0 floor with opaque finish was chosen for this project, the modern and customizable solution with pigmented resin finishing.
The particularity of the project lies in the installation, in certain areas, of a customised product based on precise aesthetic characteristics foreseen by the project design.